As a subcontractor at Port Baku Tower II, we carried out pipe welding works in the building's boiler room, ensuring all joints met the required standards for a pressurised system in a live construction environment.
The scope covered full pipe welding operations within the boiler room, from fit-up through to final welding and inspection, completed in coordination with the main contractor's programme to keep the overall build on track.